Relocating a data center requires precision, planning, and expertise. Freight Right’s data center relocation services ensure a secure and efficient migration of your IT infrastructure, minimizing downtime and protecting your critical assets.
From cabling to climate-sensitive servers, data center relocation demands a unique kind of logistics expertise. FreightRight is equipped with the tools and team to move delicate infrastructure safely—backed by a network of vetted installers and logistics professionals.
Data center logistics specialists
Climate-controlled transport options
Real-time shipment tracking
Installation-ready delivery
Compute & storage | Network & interconnect | Power & electrical | Racks, containment & pathways | Cooling & environmental | Cabling & optics | Security, monitoring & safety |
|---|---|---|---|---|---|---|
Rack servers (1U/2U), blade chassis and blades | Core/aggregation/access switches | Rack PDUs (metered/switched) and busways | Server racks/cabinets, seismic bracing | In-row/in-rack coolers, rear-door heat exchangers | Copper patch cords (Cat6/Cat6a), trunk bundles | Access control panels, badge readers, cameras, NVRs |
High-density GPU/AI servers and HPC nodes | Routers, firewalls, load balancers, SD-WAN/CPE | UPS units (rack/tower), battery cabinets (Li-ion/VRLA) | Hot/cold-aisle containment doors and panels | CRAC/CRAH units, condensers, | Fiber jumpers (LC/MPO), trunk cables | Environmental monitoring gateways, out-of-band (OOB) appliances |
Storage arrays (SAN/NAS), JBOD/JBOF enclosures, tape libraries, backup appliances | Optical gear (DWDM/CWDM mux/demux, transponders) | ATS/STS switches, remote power panels | Overhead ladder racks, cable trays, basket trays | Raised-floor grommets/brushes, blanking panels | Pre-terminated harnesses, DAC/AOC cables | Asset tags, tamper seals, cable locks |
Hyperconverged appliances (e.g., Dell VxRail, HPE SimpliVity) | Patch panels, MPO cassettes, media converters | Generators and fuel systems* (often decommissioned locally rather than moved) | Underfloor pedestals/tiles | Leak-detection sensors, temperature/humidity sensors | Grounding/bonding straps | |
KVMs, management consoles, crash carts |
Assessment & Planning
We start with a full-site assessment, mapping your infrastructure, and aligning with your internal teams. Every relocation begins with a detailed data center relocation plan and accurate quote tailored to your needs.
Decommissioning & Labeling
Our experts handle safe shutdowns, labeling, and asset tracking. We follow proven procedures to prevent misplacement and maintain full accountability.
Packing & Transportation
FreightRight provides specialized packing and white glove transportation services for sensitive IT equipment. All gear is handled by certified professionals using anti-static materials and secure crating.
Installation & Testing
At your destination, we reconnect, reinstall, and validate every component, ensuring systems are running exactly as before, if not better.
Planning Your Migration: What to Expect
Freight Right doesn’t just move your data center. We manage the migration from strategy to execution. You’ll receive a project timeline, dedicated point of contact, and full visibility every step of the way.
We serve companies migrating across the city or across the country. Our data center migration consultants are here to advise and act.
Relocating a data center isn’t just logistics—it’s a high-stakes operation. Freight Right’s experienced relocation team works with IT managers, systems engineers, and logistics professionals to execute smooth, secure migrations without disruption.
We offer:
End-to-end project management
Decommissioning and recommissioning services
White glove transportation service
Strict chain of custody protocols
Our approach prioritizes continuity, speed, and safety because in your world, every second of uptime counts.
Every move is different. Let us help you create a zero-downtime relocation plan designed for your infrastructure.
How do you relocate a data center?
We follow a proven plan: assess → decommission → transport → reinstall → test. Each step is handled by experts in data center migrations.
What’s included in a relocation plan?
Inventory mapping, timeline, compliance considerations, hardware needs, and site logistics.
How long does a relocation take?
Project timelines vary, but planning starts weeks in advance. Execution may take from 1 to 5 days depending on size and complexity.
Why choose Freight Right over general movers?
Our team understands sensitive infrastructure. We’ve moved high-risk environments for enterprise and government clients without incident.